
Dual Force, Success Stories
Case history: American Customer
“Dual Force cut down our total cycle time to less than half, without experiencing higher temperature. Thanks to Dual Force we also saved 65% of energy consumption per batch, becoming more competitive and drastically improving our lead time to market.”
Case history: European Customer
“We apply Dual Force on industrial coating, where margins are tight and time- and cost-savings are a must. Dual Force is very efficient compared to standard basket mills, it sets a new standard for the coating industry.”

Dual Force cuts cycle time by half and more compared to traditional basket mills
• Milling time reduced 50% and over
• Higher grinding power with less microbeads
• Cleaning time: reduced to 5 minutes
• Energy saving up to 40%
• 4.0 hardware and software allow Predictive
• Maintenance and early Remote Diagnostics
• State of the art Mechanical Design, high wear resistant grinding chamber with large surface cooling jacket
• Totally Paperless: operated by portable tablet (also EX-PROOF)
• Extra Model Range from 100 till 2,000 liter vessel